Skip to main content
Transport

Closure of A4010 Bradenham Lane, Bradenham Bridge 23/11/2026 – 12/12/2026

Information regarding closure

Published: 24 November 2026

Please find below an information sheet with the latest update on the closure of the A4010 by Network Rail for them to repair the railway bridge and relevant information:

Asset NAJ2 Underbridge 81 19m 0825yds
Asset Location Bradenham Road A4010 – Single Skew Span Brick Arch
Project Reference 0845_LNW_CID
Purpose of works Remove the existing steel plates and any loose or defective brickwork to the damaged arch rib. Re-case and reinstate the arch rib to its full profile using brickwork repairs in accordance with Network Rail standards. Any temporary support plates or formwork will be removed once the repair mortar has sufficiently cured.
Start and finish dates of works 23/11/2026 to 12/12/2026
Methodology of works The proposed works comprise the careful removal of all damaged and defective brickwork, followed by recasing and reinstatement to restore the structure to its full original profile, in accordance with Network Rail standards.

Due to damage being identified across several rings and courses of brickwork within the rib, the anticipated duration of the repair works is between 2 and 3 weeks.

This programme allowance reflects the requirement for temporary works to support the masonry during reconstruction, which must remain in situ for a minimum period of 7 days to achieve the necessary curing time for each section of rebuild.

Traffic management to be implemented The original proposal was to implement two-way traffic lights with a lane closure adjacent to the worksite, allowing traffic to continue to pass for the duration of the works. However, due to the profile of the structure, this arrangement was deemed unfeasible as it would present an increased risk of bridge strike.

As a result, a full road closure is required to safely facilitate the repair works. The works will be undertaken from tower scaffolding positioned within the carriageway.

Emergency services access can be facilitated; however, response times will be dependent on the specific activity being undertaken at the time.

Should emergency services require access while a task is in progress that cannot be safely or immediately suspended, the site team will manage the temporary opening of the closure at both ends of the structure to allow the emergency vehicle to pass around the worksite, in a manner similar to the arrangement illustrated on the following slide.

Working hours (including any proposed out of hours working) 24/7 Closure
Affected roads (including private streets) Roads affected are

Works are on the A40 with a large diversion route and increased travel time via the surrounding roads A329 – A418 – A41 – A413 – B4443 – A4010

Stakeholder distribution

Residents:

Businesses:

Schools:

Bus operators:

Emergency services:

Bradenham Road residents to receive letter from NR detailing taxi provision for those unable to take bus. Centurion TM sent resident letters out.

Network Rail sending press release to provide information about the closure – encompassing residents and businesses.

Bucks Council writing to local schools and arranging with bus operators a diversion route, along with home to school provision.

Network Rail writing to Stoke Mandeville and Wycombe Hospitals detailing the road closure and the provision for blue lights access.